Hong Kong International Airport, Terminal 2
Automated facade engineering
Richard led facade engineering where analysis, design and documentation formed one automated pipeline. When the client issued revised wind loads midway through design, the pipeline absorbed the change with minimal rework.
Delivered with a previous employer.